Title: Roadford operational and environmental study : interim report. Volume 1 : main report
Author: National Rivers Authority South West Region
Document Type: Monograph
Abstract:
The report is Intended as a working document for use during the remaining part of the study. For members of the study team it represents the first opportunity to collate the detailed findings of all the many varied facets of the work. Inevitably, there will be areas where different parts of the report are not fully consistent with each other. This applies particularly to the technical annexes. Any such inconsistencies will be addressed during the production of the Final Report. The Interim Report is also intended as a document for use in consultation with riparian owners, nature conservation interests and staff of the NRA and the Company. At this stage, there is nothing in the report in terms of either the assessment of environmental impact or the proposals for operating rules which should be taken as conclusive. It is anticipated that all aspects of the report will be subject to careful scrutiny and discussion by the many interested parties before the study is finished.
Publisher: National Rivers Authority
Publication Date: 1990
Publication Place: [Exeter]
Subject Keywords: Water reservoirsConstructionEnvironmental impact
Geographic Keywords: EA South WestTamar catchmentTamarDart (Devon)East Devon catchment
Extent: 63; + appendices
Permalink: http://www.environmentdata.org/archive/ealit:2646