Skip to main content

PDF


Title: River Cherwell catchment management plan : consultation report : April 1995
Author: National Rivers Authority Thames Region
Document Type: Monograph
Abstract:
This Consultation Report has been prepared for the Cherwell Catchment, which lies in the West Area of the NRAs Thames Region (NRA-TR). It has been produced at an interim stage of the Catchment Management Planning Process. It describes the catchment, reviews the state of the water environment and identifies key catchment issues. In addition, a draft catchment vision has been formulated, along with potential strategies and actions for addressing the issues. These will only be finalised once the NRA has completed the consultation process and all responses have been reviewed. To assist in the preparation of this report, a range of organisations and groups were contacted during August 1994. The results of this period of informal consultation are summarised in Appendix B.
Publisher: National Rivers Authority
Publication Date: 1995
Publication Place: Wallingford
Subject Keywords: Catchment managementCatchment Management PlansRiversWater qualityConsultationNature conservationFlood risk managementRiver fisheriesLand useWater pollutionPollution controlRecreation
Geographic Keywords: Cherwell (river)Cherwell catchmentOxfordshire
Extent: 106; + appendices
Permalink: http://www.environmentdata.org/archive/ealit:2968
Total file downloads: 303

Download PDF    Display PDF in separate tab