Skip to main content

PDF


Title: Welland and Nene Local Flood Defence Committee : annual inspection : 26 June 1998
Author: Environment Agency Anglian Region
Document Type: Monograph
Abstract:
This report shows different actions taken in the Welland and Nene Local Flood Defence Committee. Actions taken into account in this report are: the Pearkik Pumping station; the Maxey cut; the A15/16 Market Deeping Bypass; River Welland through Deeping St. James; the Wyde Welland; the Pinchbeck Engine; River Nene stabilisation phase B Sutton Bridge to the Lighthouses; Wisbech Defences; Wisbech Port Regeneration; and Tidal Nene Dog-in-a-Doublet Bridge sluice to Guyhirn.
Publisher: Environment Agency
Publication Date: 1998
Publication Place: Peterborough
Subject Keywords: Flood defence committeesAction plans
Geographic Keywords: EA AnglianWelland catchmentNene catchment
Extent: n.p. [47]
Permalink: http://www.environmentdata.org/archive/ealit:1527
Total file downloads: 274

Download PDF    Display PDF in separate tab